NexBilt

Are you ready tomake quotingthe easiest partof the job?

AI scoping and quoting tool for builders and trades.

Quote from local pricebooks or your own rates.

Bring one real job. Quote it in NexBilt.

If it doesn't beat your current process, delete the account. 
That's the whole pitch.

Start free on NexBilt

PROPERTY • ASSESSMENT • CONSTRUCTION

Capture the property once.
Turn it into whatever comes next.

Create property reports, assessments, scopes, quotes and project plans from the same site evidence.

  • NexBilt capture screen showing site video, photos and notes recorded on site.
  • NexBilt property report built from captured photos, observations and findings.
  • NexBilt assessment screen linking visible damage to supporting site evidence.
  • NexBilt scope of works generated from the captured site evidence.
  • NexBilt quote priced from the approved scope, quantities and materials.
  • NexBilt project plan sequencing trades and milestones before work begins.
  • REAL ESTATE & PROPERTY

    Inspection and condition reports

  • ASSESSORS

    Evidence, assessments and repair scopes

  • BUILDERS & TRADES

    Scopes, quotes and project delivery

How it works

Four problems every builder knows. Four things NexBilt fixes.

Six hours in a spreadsheet for one quote.

Record a 2-3 minute site walkthrough. NexBilt carefully analyses the video, photos and notes, then drafts the scope for you.

A cluttered estimating spreadsheet with handwritten notes converted into a clean, structured NexBilt quote with concrete, framing, insulation, plasterboard, electrical and earthwork sections and a total.

Guessing rates from memory or last year's job.

Every line item is priced from up to date regional pricebooks or from your custom rates.

Old paper quotes, a notebook of crossed-out labour rates and a calculator replaced by the NexBilt Australian Regional Pricebook showing current Perth, WA labour and material rates per unit.

Programs that fall apart the moment one trade slips.

A trade-based Gantt with real dependency logic. Adjust one trade and dependent trades cleanly re-flow. NexBilt then notifies the affected trades and client of changes. No rebuilding schedules at 10pm.

A NexBilt construction Gantt schedule where a three-day plumbing delay automatically re-flows carpentry, electrical, plastering, painting and handover, with a recalculated forecast finish date.

Quote in Excel, SWMS in Word, handover in a shared drive.

Quote, scope, SWMS and schedule bundled into one program.

Separate quote, SWMS and handover documents connected into a single NexBilt project hub listing quote total, SWMS version, handover files, schedule and variations with live statuses.

The stack

One platform. Every part of the job.

Each module talks to the others. A scope edit reshapes the quote. A quote build seeds the schedule. The schedule generates the SWMS pack.

  • AI QuotingVIDEO · PHOTOS · DOCS
  • Project ManagementGANTT · SCHEDULES
  • TradeBaseCONTRACTORS · COMPLIANCE
  • VariationsAPPROVAL WORKFLOW
  • SWMS SafetyAUTO-BUILT PER TRADE
  • PricebooksREGIONAL · EDITABLE
  • Property ReportsCONDITION · INSPECTION
  • Learning HubONBOARDING & GUIDES

Same job, different day

What actually changes when you switch.

Six hours in a spreadsheet
Twelve minutes, phone in hand
Guessing rates from memory
Your regional pricebook, every line
SWMS built the night before
Auto-built the moment scope lands
Variations lost in text threads
Tracked, priced, approved, invoiced

Pricing

One quote won pays for the year.

Every plan includes a monthly credit balance.  Top up any time.

Trade Pro
From$169per month

billed yearly · save 15%

For the sole trader and small crew running quotes weekly.

  • 100 credits / month
  • Increased storage capacity
  • AI quoting + SWMS
  • Regional pricebooks
  • Single user
Trade Business
From$509per month

billed yearly · save 15%

For growing trades with a team on the tools.

  • 250 credits / month
  • Increased storage capacity
  • Everything in Trade Pro
  • Unlimited team members
  • Company-wide pricebooks
Enterprise Pro
From$764per month

billed yearly · save 15%

The full builder workflow — quoting, PM, variations.

  • 300 credits / month
  • Increased storage capacity
  • Project management + Gantt
  • Variations + TradeBase
  • Unlimited team members
Enterprise Business
From$1,529per month

billed yearly · save 15%

For firms running 10+ live jobs at once.

  • 750 credits / month
  • Increased storage capacity
  • Property reports module
  • Priority support
  • Unlimited team members

Request a demo

Want a walkthrough on your next job?

Book a 20-minute call. Bring a real quote, plan set, or site photos — we'll show you exactly how NexBilt would handle it, priced from your own rates.

NexBilt Resources

Latest from the Builder Insights.

Builder reviewing a quote on a tablet next to construction plans and site photos
New

AI Quoting in Construction

A good prompt is only the start.

Why AI quoting tools need more than a prompt and a rate. How NexBilt turns site information into a scoped, priced quote.

Read the guide
Construction framing at dusk
Guide

The builder's guide to construction quoting

Scope first. Price second.

Why most quotes leak margin before the job starts — and how to write a scope-first quote that protects your profit.

Read the guide
NexBilt

NexBilt turns site evidence into client-ready quotes, scopes and reports - built for Australian builders and tradies. Less admin. More action.

© 2026 NexBilt. All rights reserved.

All software code, workflows, prompts, AI logic, templates, user interface designs, trade-first scope formatting, pricing logic, and documentation contained in this application are the exclusive intellectual property of NexBilt and may not be copied, reproduced, modified, or redistributed without written permission.